Saar Development Project
Neo Holding successfully carried out the development works for Road No. 27 and Road No. 79 in Saar and Janabiya as part of its ongoing commitment to delivering high-quality infrastructure projects across the Kingdom of Bahrain. The project covered a total length of approximately 4 kilometers and was aimed at improving road connectivity, infrastructure efficiency, and public services within the area.
The scope of work included the construction and installation of comprehensive stormwater drainage networks designed to improve water management and reduce flooding risks. In addition, the project involved the construction of a dedicated stormwater lift station to support the effective operation of the drainage system and enhance overall infrastructure performance.
Additional works included treated water network installations, construction of concrete and steel barriers, street lighting systems, utility duct works, as well as electrical and compaction works necessary to support the long-term durability and safety of the roads and surrounding infrastructure.
Throughout the project, Neo Holding ensured that all works were executed according to high engineering and quality standards while maintaining a strong focus on safety, efficiency, and timely delivery. The successful completion of the project contributed significantly to enhancing infrastructure services, improving road conditions, and supporting ongoing urban development within the area.